General Description
Equipped with all the zero leak bidirectional checking sole-noid valves, this energy unit is created for the operation of two independent circuits. Which are respectively to the major and subordinate platforms of your double scissors lift. Two cut-off valves are
utilised for decreasing the machine manually in situation of electrical power loss. If a lot more independent circuits are necessary to your application please get hold of us for availability.
Remark: 1. Please seek advice from our sales engineer for that different pump displacement, motor electrical power or tank capability.
2. CSA or UL certified motors are available on request.
Specific Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean all of the hydraulic elements concerned before set up of the power unit.
three. Viscosity on the oil shoud be 15~46 cst,plus the oil need to be clean and free of impurities,N46 hydraulic oil is advisable.
4. The electrical power unit really should be mounted vertically.
five. Check the oil degree from the tank soon after the original running with the electrical power unit.
6. Oil altering is needed after the preliminary a hundred operation hours,afterwards after each 3000 hours.